Sydney CivilEstimating

Road, pavement and asphalt estimating

New roads, reconstruction, resurfacing and car parks, priced layer by layer, along with the traffic control and night work the job actually needs.

Pavement and kerbNTS

What's included

Pavement

  • Boxing and subgrade preparation
  • Subbase and base, by layer and thickness
  • In-situ stabilisation
  • Prime, primer seal and tack coat

Asphalt and seals

  • Asphalt wearing and base courses
  • Spray seals
  • Profiling and resheeting
  • Small jobs and night shifts

Kerb and edges

  • Kerb and gutter, laybacks, dish drains
  • Medians, islands and pram ramps
  • Driveways, footpaths, shared paths
  • Tie-ins to existing roads

Finishing

  • Line marking and pavement markers
  • Signs and guide posts
  • Traffic control and staging
  • Testing

Where road prices come unstuck

On a live road the traffic plan can cost as much as the pavement. We price the staging the job will really need, shift by shift, and show it separately so you can check it against your traffic control subcontractor.

Asphalt is bought by the tonne, not the square metre. Area times depth times density, plus the extra you lose on an uneven milled surface, is what the plant will charge you for. Small pours and night shifts also carry minimum loads and standing time, and we price them the way you'll be charged.

The existing pavement is rarely the depth the drawing assumes, and tying into existing kerbs and driveways always takes more than it looks. We write down what we've assumed, so if it's different on the day, the variation is clear.

Common questions

Do you price council resurfacing programmes?

Yes, including schedules of rates, with the traffic control, night work and small-job allowances shown so the rates hold up across the whole programme.

Which specifications do you price to?

Whatever the tender calls up. In NSW that's usually Transport for NSW or the council's own standard. Interstate it's the local road authority's. If the tender doesn't say, we note what we've assumed.

Can you price the drainage and services on the same road?

Yes. Stormwater, utilities and structures can all go in the same estimate.

Send us the RFQ

The tender documents, drawings and closing date. We'll come back with a fee and a delivery date, usually the same business day.

CallWhatsAppSend RFQ